Skip to content
Hurricane season runs June 1 to November 30. Ask for the storm-and-fall walk-through.
Monday – Friday: 8 a.m. – 4:30 p.m.Certified Residential Contractor · FL License # 000000VerifyGeneral liability and workers' compensation
1 more license
  • Certified Residential Contractor · FL License # 000000Verify
  • General liability and workers' compensation
(941) 555-0102

Remodeling for people who plan to stay

Two kinds of safe, one walk-through

A Sarasota house has to get through hurricane season and the next ten years of stairs, wet floors and dim halls. We look at both on one visit, write them on one page, and build what you choose.

Woman in a blue cardigan holding a metal handrail on outdoor concrete stairs, face out of frame

The year here

Plan the work around the storm season

Hurricane season runs June 1 to November 30, and outdoor concrete wants a dry spell. We schedule around both, so each job is done before you need it.

  • Shutters, doors and entry thresholds

    Windows and doors are made to order and take weeks to arrive. Starting in winter means they are in before June.

    Jan to May

  • Ramps and landings

    Concrete and framing do best in the dry months. A ramp booked in summer waits for a dry stretch.

    Oct to May

  • Baths, rails and lighting

    Indoor work doesn't wait on weather, so it is the work we keep scheduling through the summer.

    all year

  • Work while you're up north

    Seasonal residents leave in spring. We work while the house is empty and send photos, so you come back to a finished room.

    May to Oct

  • Hurricane season

    When a named storm is in the Gulf, we secure open work and stop until it passes.

    Jun to Nov

The one-page plan

One walk-through, two lists

We walk the house with you, with a son or daughter on the phone if you like. You get one page showing what would keep you on your feet and what would see the house through a storm, in the order we'd do them.

Fall safety

  • At the front door

    A level way in, rails on both sides, a landing wide enough to turn on

  • In the bath

    No curb to step over, a seat, bars set into the wall

  • At the windows and the slider

    Handles and locks you can work with weak hands

  • In the hall

    Wide, even floors and lights that come on as you walk

Storm safety

  • At the front door

    A door and threshold rated for your wind zone, on a landing that sheds water

  • In the bath

    An interior room you can reach in the dark, with a seat and a battery light

  • At the windows and the slider

    Shutters or impact-rated glass you can close without lifting a panel

  • In the hall

    A clear path to the safest room and an outlet where a medical device plugs in

What we build

Six kinds of work, one kind of visit

Every job starts the same way: we come to the house, watch how you move through it, and write down what we see.

  • Bathrooms

    Showers with no curb, bars in solid wall, toilets at the right height.

    What's included
  • Entries and ramps

    A ramp, a landing or a lower step, and a door that's easy to pass.

    What's included
  • Stairs, rails and lighting

    Rails on both sides, treads you can see, light before you need it.

    What's included
  • Doors, halls and floors

    Doorways a walker clears and floors without thresholds to catch a toe.

    What's included
  • Kitchens and laundry

    Counters, shelves and appliances set where your hands and eyes are.

    What's included
  • Storm-ready openings

    Windows, doors and shutters you can close yourself.

    What's included

For sons and daughters

Calling from somewhere else?

You don't have to be in Sarasota to get this right. Eloisa, our project manager, is the one person you call.

Text us a photo of the stairs or the bath, join the walk-through by phone, and read the written scope from wherever you are. Your parent signs. You stay in the loop.

What you get

  • Photos from the job at the end of a work day

  • The written scope sent to you both

  • One person to call, with a direct number

  • A last walk through the house with your parent, not only a checklist

Older man in a hat walking with a rollator on the lawn path toward a white house with a columned porch

How it goes

From the first call to the last rail

  1. 01

    Step 1: A call or a text

    Tell us who lives there and what's hard now. A photo helps.

  2. 02

    Step 2: The walk-through

    We measure, watch how you get around, and ask what you do in a storm.

  3. 03

    Step 3: The written scope

    One page of what to do first, with what each piece includes, what it leaves out and what it costs.

  4. 04

    Step 4: The work, then a last walk

    One project manager, floors covered, and a final walk through the house with you using every new rail.

Pricing

What decides the price

We don't print an average, because two bathrooms the same size can differ by a concrete slab.

  • The floor under the room

    A curbless shower on a concrete slab means cutting and re-pouring part of the slab. On a raised floor it doesn't.

  • How far things have to move

    Moving a drain, a door or a wall costs more than replacing what is already there.

  • Approvals

    A permit, and for condos and associations a board's approval, set the schedule and sometimes the scope.

  • What you choose to see and touch

    Tile or solid panels, one grab bar or ten, a painted rail or a hardwood one.

You get a written scope and a number after the walk-through, never over the phone.

After the work

“They asked how I get out of the tub, not how I wanted it to look. The bath works the way I move.”

Glynn M.Homeowner

“I live in Atlanta. Eloisa sent photos each afternoon and a note about what was next. I never had to guess.”

Archie D.Son of a homeowner

“The ramp is gentle, the rail is where my hand falls, and they told me what the permit would ask. Nothing surprised me.”

Debbie G.Homeowner

Sample reviews.

Sarasota, Manatee and Charlotte counties

Houses of every age, from 1960s slab ranches to newer homes in community associations.

  • Sarasota County: Sarasota, Laurel, Bird Key, Fruitville, Whitfield, South Venice, North Port, Englewood, Warm Mineral Springs · Most of our work, from the city south to North Port and Englewood
  • Manatee County: Oneco, Ellenton, Parrish, Tallevast, Cortez, Holmes Beach, Anna Maria, Bradenton Beach · Oneco and Ellenton out to Anna Maria Island
  • Charlotte County: Port Charlotte, Punta Gorda, Rotonda West · Our southern edge

We don't work north of Ellenton, south of Punta Gorda, or on Longboat Key and Siesta Key. If your street is near an edge, call and ask.

Questions families ask first

Do I have to be home for the walk-through?

Someone who lives there should be, so we can watch how they move. A family member can join by phone, and you can text us photos beforehand.

Can you work around a condo or association?

Yes. We write the scope in the form your board asks for, and the schedule allows for their review. We don't start before they approve.

What if a storm is coming mid-job?

We secure what is open, protect the materials and stop until it passes. The contract says what happens to the schedule.

Will Medicare or my insurance pay for this?

Medicare and most health insurance don't pay for home changes. Veterans may qualify for VA grants. We give you an itemized scope for any agency that asks.

Do you do emergency repairs after a storm?

No. We're a planned-project firm. After a storm we can tell you who to call, and we'll look at your house when it's safe.

Book a walk-through

Tell us who the work is for and what worries you. We'll call or text to set a time.

Hours
Monday – FridayToday
8 a.m. – 4:30 p.m.
SaturdayToday
By appointment
SundayToday
Closed
What worries you most?

A walk-through is a visit to the house, with measurements and questions. A written scope with a number follows it, and you decide after.